Irvine BMW
9881 Research Drive Irvine, CA 92618

2025 BMW M5 Base at Irvine BMW

2025 BMW M5 Base

Selling Price: $109,888

Photo Gallery

Vehicle Basics

  • Vehicle Make : BMW
  • Vehicle Model : M5
  • Condition : Used
  • Mileage : 7,592
  • VIN : WBS83FK0XSCU57127
  • Stock # : P42809
  • Engine :
  • Transmission : 8-Speed Automatic Sport
  • Ext. Color : Gray
  • Int. Color : Black
  • Vehicle Type : Sedan
  • Body Style : 4D Sedan
  • Drivetrain : AWD
City MPG * 0 Hwy MPG * 0

*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.

This 2025 Brooklyn Grey Metallic BMW M5 AWD is well equipped and includes these features and benefits.Connected Package Pro, Driving Assistance Professional Package (Active Driving Assistant Pro), Executive Package (BMW Iconic Glow Kidney Grille, Front & Rear Heated Seats, Front Ventilated Seats, Interior Camera, Parking Assistant Plus, and Power Rear Sunshade & Rear Side Window Shades), Black Leather, Live Cockpit Pro (incl. Navi), 18 Speakers, 4-Wheel Disc Brakes, ABS brakes, Adaptive suspension, Air Conditioning, Alloy wheels, AM/FM radio: SiriusXM, Apple CarPlay Compatibility, Auto High-beam Headlights, Auto tilt-away steering wheel, Auto-dimming door mirrors, Auto-dimming Rear-View mirror, Automatic temperature control, BMW Assist eCall, BMW Curved Display w/HUD, BMW TeleServices, Bowers & Wilkins Surround Sound, Brake assist, Bumpers: body-color, Carbon Fiber Silver Thread High Gloss Trim, Comfort Access keyless entry, ConnectedDrive Services, Delay-off headlights, Driver door bin, Driver vanity mirror, Dual front impact airbags, Dual front side impact airbags, Electronic Stability Control, Emergency communication system: BMW Assist eCall, Extended Merino Leather Upholstery, Exterior Parking Camera Rear, Four wheel independent suspension, Front anti-roll bar, Front Bucket Seats, Front Center Armrest, Front dual zone A/C, Front reading lights, Fully automatic headlights, Heads-Up Display, Heated door mirrors, Heated Front Seats, Heated front seats, Heated steering wheel, Illuminated entry, Leather steering wheel, Low tire pressure warning, M Compound Brakes w/Red Calipers, M Multi-Function Seats, Memory seat, Occupant sensing airbag, Outside temperature display, Overhead airbag, Panic alarm, Passenger door bin, Passenger vanity mirror, Personal eSIM 5G, Power door mirrors, Power driver seat, Power Front Seats, Power passenger seat, Power steering, Power windows, Radio data system, Radio: AM/FM Audio System, Rain sensing wipers, Rear air conditioning, Rear anti-roll bar, Rear dual zone A/C, Rear reading lights, Rear seat center armrest, Rear window defroster, Security system, SiriusXM Satellite Radio w/1-Year Subscription, Speed control, Speed-sensing steering, Speed-Sensitive Wipers, Split folding rear seat, Sport steering wheel, Steering wheel memory, Steering wheel mounted audio controls, Tachometer, Telescoping steering wheel, Tilt steering wheel, Traction control, Trip computer, Turn signal indicator mirrors, Universal garage-door opener, Variably intermittent wipers, Wheels: 20" x 10.5" Fr & 21" x 11" Rr Jet Black, Wheels: 20" x 10.5" Fr & 21" x 11" Rr M Dual-Spoke, and Wireless Device Charging. Clean CARFAX. CARFAX One-Owner. Black Leather.

Browse Other Vehicles at Irvine BMW

Dealership Info

BMW logo

Irvine BMW

Irvine BMW

Vehicle Features

  • Live Cockpit Pro (incl. Navi)
  • Connected Package Pro
  • Driving Assistance Professional Package
  • Executive Package
  • 18 Speakers
  • AM/FM radio: SiriusXM
  • Bowers & Wilkins Surround Sound
  • Radio data system
  • Radio: AM/FM Audio System
  • SiriusXM Satellite Radio w/1-Year Subscription
  • Air Conditioning
  • Automatic temperature control
  • Front dual zone A/C
  • Rear air conditioning
  • Rear dual zone A/C
  • Rear window defroster
  • Comfort Access keyless entry
  • Heads-Up Display
  • Memory seat
  • Power driver seat
  • Power steering
  • Power windows
  • Steering wheel memory
  • Steering wheel mounted audio controls
  • Adaptive suspension
  • Four wheel independent suspension
  • Speed-sensing steering
  • Traction control
  • 4-Wheel Disc Brakes
  • ABS brakes
  • Dual front impact airbags
  • Dual front side impact airbags
  • Emergency communication system: BMW Assist eCall
  • Front anti-roll bar
  • Low tire pressure warning
  • M Compound Brakes w/Red Calipers
  • Occupant sensing airbag
  • Overhead airbag
  • Rear anti-roll bar
  • Brake assist
  • Electronic Stability Control
  • Exterior Parking Camera Rear
  • Auto High-beam Headlights
  • Delay-off headlights
  • Fully automatic headlights
  • Panic alarm
  • Security system
  • Speed control
  • Auto-dimming door mirrors
  • BMW Iconic Glow Kidney Grille
  • Bumpers: body-color
  • Heated door mirrors
  • Power door mirrors
  • Turn signal indicator mirrors
  • Active Driving Assistant Pro
  • Apple CarPlay Compatibility
  • Auto tilt-away steering wheel
  • Auto-dimming Rear-View mirror
  • BMW Assist eCall
  • BMW Curved Display w/HUD
  • BMW TeleServices
  • Carbon Fiber Silver Thread High Gloss Trim
  • ConnectedDrive Services
  • Driver door bin
  • Driver vanity mirror
  • Front reading lights
  • Heated steering wheel
  • Illuminated entry
  • Interior Camera
  • Leather steering wheel
  • M Multi-Function Seats
  • Outside temperature display
  • Parking Assistant Plus
  • Passenger vanity mirror
  • Personal eSIM 5G
  • Rear reading lights
  • Rear seat center armrest
  • Sport steering wheel
  • Tachometer
  • Telescoping steering wheel
  • Tilt steering wheel
  • Trip computer
  • Universal garage-door opener
  • Wireless Device Charging
  • Extended Merino Leather Upholstery
  • Front & Rear Heated Seats
  • Front Bucket Seats
  • Front Center Armrest
  • Front Ventilated Seats
  • Heated Front Seats
  • Heated front seats
  • Power Front Seats
  • Power passenger seat
  • Split folding rear seat
  • Passenger door bin
  • Alloy wheels
  • Wheels: 20" x 10.5" Fr & 21" x 11" Rr Jet Black
  • Wheels: 20" x 10.5" Fr & 21" x 11" Rr M Dual-Spoke
  • Power Rear Sunshade & Rear Side Window Shades
  • Rain sensing wipers
  • Speed-Sensitive Wipers
  • Variably intermittent wipers

Disclaimer & Legal Info

Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.