2025 BMW M4 Competition at Irvine BMW
https://research.irvinebmw.com/cars/Used/2025/BMW/M4/Competition/160185852025 BMW M4 Competition
Selling Price: $91,888
Photo Gallery
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 13,454
- VIN : WBS43BA08SCS52723
- Stock # : X75124A
- Engine :
- Transmission : 8-Speed Automatic Sport
- Ext. Color : Gray
- Int. Color : Black
- Vehicle Type : Convertible
- Body Style : 2D Convertible
- Drivetrain : AWD
City MPG *
16
Hwy MPG *
22
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
This 2025 Dravit Gray Metallic BMW M4 Competition AWD is well equipped and includes these features and benefits. Certified. Clean CARFAX. CARFAX One-Owner.
Vehicle Features
- Live Cockpit Pro (incl. Navi)
- Navigation
- Connected Package Pro
- Executive Package
- 16 Speakers
- AM/FM radio: SiriusXM with 360L
- Audio memory
- harman/kardon Surround Sound System
- harman/kardon® Speakers
- Radio data system
- Radio: AM/FM Audio System
- SiriusXM
- Air Conditioning
- Automatic temperature control
- Front dual zone A/C
- HVAC memory
- Neck Warmer
- Rear window defroster
- Comfort Access keyless entry
- Lumbar Support
- Memory seat
- Power driver seat
- Power steering
- Power windows
- Remote Engine Start
- Steering wheel mounted audio controls
- Adaptive suspension
- Four wheel independent suspension
- Speed-sensing steering
- Traction control
- 4-Wheel Disc Brakes
- ABS brakes
- Dual front impact airbags
- Dual front side impact airbags
- Emergency communication system: BMW Assist eCall
- Front anti-roll bar
- Integrated roll-over protection
- Knee airbag
- Low tire pressure warning
- M Compound Brakes w/Red Calipers
- Occupant sensing airbag
- Rear anti-roll bar
- Brake assist
- Electronic Stability Control
- Exterior Parking Camera Rear
- Auto High-beam Headlights
- Delay-off headlights
- Fully automatic headlights
- Panic alarm
- Security system
- Speed control
- Auto-dimming door mirrors
- Bumpers: body-color
- Convertible roof wind blocker
- Heated door mirrors
- M Shadowline Lights
- Power door mirrors
- Turn signal indicator mirrors
- Apple CarPlay Compatibility
- Auto-dimming Rear-View mirror
- BMW Assist eCall
- BMW Curved Display w/HUD
- BMW TeleServices
- Carbon Fiber Trim
- Compass
- ConnectedDrive Services
- Convertible roof lining
- Driver door bin
- Driver vanity mirror
- Front reading lights
- Heated Steering Wheel
- Illuminated entry
- Leather Shift Knob
- Leather steering wheel
- Outside temperature display
- Overhead console
- Passenger vanity mirror
- Personal eSIM 5G
- Power convertible roof
- Rear reading lights
- Rear seat center armrest
- Sport steering wheel
- Tachometer
- Telescoping steering wheel
- Tilt steering wheel
- Trip computer
- Universal garage-door opener
- Widescreen Display
- Extended Merino Leather Upholstery
- Front Bucket Seats
- Front Center Armrest
- Front Ventilated Seats
- Heated Front Seats
- Heated front seats
- M Sport Seats
- Power Front Seats
- Power passenger seat
- Split folding rear seat
- Passenger door bin
- Alloy wheels
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Forged Black
- Glass rear window
- Rain sensing wipers
- Speed-Sensitive Wipers
- Variably intermittent wipers
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.