2025 BMW M4 CS at Irvine BMW
https://research.irvinebmw.com/cars/Used/2025/BMW/M4/CS/159770402025 BMW M4 CS
Selling Price: $129,888
Photo Gallery
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 4,825
- VIN : WBS43HK07SCT59232
- Stock # : P42489
- Engine :
- Transmission : 8-Speed Automatic Sport
- Ext. Color : Gray
- Int. Color : Anthracite
- Vehicle Type : Coupe
- Body Style : 2D Coupe
- Drivetrain : AWD
City MPG *
16
Hwy MPG *
23
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
This 2025 Brooklyn Gray Metallic BMW M4 CS AWD is well equipped and includes these features and benefits. Clean CARFAX. CARFAX One-Owner.
Vehicle Features
- Live Cockpit Pro (incl. Navi)
- Navigation
- Connected Package Pro
- 16 Speakers
- AM/FM radio: SiriusXM with 360L
- Audio memory
- harman/kardon Surround Sound System
- harman/kardon® Speakers
- Radio data system
- Radio: AM/FM Audio System
- SiriusXM
- Air Conditioning
- Automatic temperature control
- Front dual zone A/C
- HVAC memory
- Rear window defroster
- Comfort Access keyless entry
- Heads-Up Display
- Memory seat
- Power driver seat
- Power steering
- Power windows
- Steering wheel mounted audio controls
- Adaptive suspension
- Four wheel independent suspension
- Speed-sensing steering
- Traction control
- 4-Wheel Disc Brakes
- ABS brakes
- Dual front impact airbags
- Dual front side impact airbags
- Emergency communication system: BMW Assist eCall
- Front anti-roll bar
- Knee airbag
- Low tire pressure warning
- Occupant sensing airbag
- Overhead airbag
- Rear anti-roll bar
- Brake assist
- Electronic Stability Control
- Exterior Parking Camera Rear
- Auto High-beam Headlights
- Delay-off headlights
- Fully automatic headlights
- Panic alarm
- Security system
- Speed control
- Auto-dimming door mirrors
- Bumpers: body-color
- Heated door mirrors
- Power door mirrors
- Spoiler
- Turn signal indicator mirrors
- Apple CarPlay Compatibility
- Auto-dimming Rear-View mirror
- BMW Assist eCall
- BMW TeleServices
- Compass
- ConnectedDrive Services
- Driver door bin
- Driver vanity mirror
- Front reading lights
- Illuminated entry
- Leather Shift Knob
- M Carbon Bucket Seats
- Outside temperature display
- Overhead console
- Passenger vanity mirror
- Personal eSIM 5G
- Rear reading lights
- Rear seat center armrest
- Sport steering wheel
- Tachometer
- Telescoping steering wheel
- Tilt steering wheel
- Trip computer
- Universal garage-door opener
- Widescreen Display
- Front Bucket Seats
- Front Center Armrest
- Full Merino Leather Upholstery (X3)
- Heated Front Seats
- Heated front seats
- Power Front Seats
- Power passenger seat
- Split folding rear seat
- Passenger door bin
- Alloy wheels
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Blk M Star Spk
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Gold Bronze
- Rain sensing wipers
- Speed-Sensitive Wipers
- Variably intermittent wipers
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.