2023 BMW M5 Base at Irvine BMW
https://research.irvinebmw.com/cars/Used/2023/BMW/M5/Base/171501062023 BMW M5 Base
Selling Price: $87,888
Photo Gallery
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 34,772
- VIN : WBS83CH04PCM97684
- Stock # : L42852
- Engine :
- Transmission : 8-Speed Automatic Sport
- Ext. Color : Black
- Int. Color : Black
- Vehicle Type : Sedan
- Body Style : 4D Sedan
- Drivetrain : AWD
City MPG *
15
Hwy MPG *
21
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
This 2023 Black Sapphire Metallic BMW M5 AWD is well equipped and includes these features and benefits.Competition Package (Extended Shadowline Trim, M Seat Belts, M Shadowline Lights, and Wheels: 20" x 9.5" Fr & 20" x 10.5" Rr M Y-Spoke), Competition Package (7MA), Connected Package Pro, Driving Assistance Professional Package (Active Driving Assistant Pro and Extended Traffic Jam Assistant), Executive Package (Active Park Distance Control, Drive Recorder, Front & Rear Heated Seats, Front Massaging Seats, Front Ventilated Seats, Parking Assistant Plus, Power Rear Sunshade & Rear Side Window Shades, Rear-View Camera, Soft-Close Automatic Doors, and Surround View w/3D View), Black Leather, Live Cockpit Pro (incl. Navi), 16 Speakers, 4-Wheel Disc Brakes, ABS brakes, Adaptive suspension, Air Conditioning, Alloy wheels, Aluminum Dark Carbon Structure Trim, AM/FM radio: SiriusXM, Apple CarPlay Compatibility, Auto High-beam Headlights, Auto tilt-away steering wheel, Auto-dimming door mirrors, Auto-dimming Rear-View mirror, Automatic temperature control, BMW Assist eCall, BMW TeleServices, Brake assist, Bumpers: body-color, Comfort Access keyless entry, ConnectedDrive Services, Delay-off headlights, Driver door bin, Driver vanity mirror, Dual front impact airbags, Dual front side impact airbags, Electronic Stability Control, Emergency communication system: BMW Assist eCall, Extended Merino Leather Upholstery, Exterior Parking Camera Rear, Four wheel independent suspension, Front anti-roll bar, Front Bucket Seats, Front Center Armrest, Front dual zone A/C, Front reading lights, Fully automatic headlights, Gesture Control, harman/kardon Surround Sound System, harman/kardon Speakers, Heads-Up Display, Heated door mirrors, Heated Front Seats, Heated front seats, Heated steering wheel, Illuminated entry, Leather Shift Knob, Leather steering wheel, Live Cockpit Pro w/Navi, Low tire pressure warning, M Compound Brakes w/Red Calipers, Memory seat, Multi-Function Seats w/Lumbar Support, Occupant sensing airbag, Outside temperature display, Overhead airbag, Panic alarm, Passenger door bin, Passenger vanity mirror, Power door mirrors, Power driver seat, Power Front Seats, Power passenger seat, Power steering, Power windows, Radio data system, Radio: AM/FM Audio System, Rain sensing wipers, Rear air conditioning, Rear anti-roll bar, Rear dual zone A/C, Rear reading lights, Rear seat center armrest, Rear window defroster, Security system, SiriusXM Satellite Radio, Speed control, Speed-sensing steering, Speed-Sensitive Wipers, Split folding rear seat, Spoiler, Sport steering wheel, Steering wheel memory, Steering wheel mounted audio controls, Tachometer, Telescoping steering wheel, Tilt steering wheel, Traction control, Trip computer, Turn signal indicator mirrors, Universal garage-door opener, Variably intermittent wipers, Wheels: 19" x 9.5" Fr & 19" x 10.5" Rr Bi-Color, Wheels: 20" x 9.5" Fr & 20" x 10.5" Rr Black, WiFi Hotspot, and Wireless Charging. Clean CARFAX. CARFAX One-Owner. Black Leather.
Vehicle Features
- Live Cockpit Pro (incl. Navi)
- Competition Package
- Competition Package (7MA)
- Connected Package Pro
- Driving Assistance Professional Package
- Executive Package
- 16 Speakers
- AM/FM radio: SiriusXM
- harman/kardon Surround Sound System
- harman/kardon® Speakers
- Radio data system
- Radio: AM/FM Audio System
- SiriusXM Satellite Radio
- Air Conditioning
- Automatic temperature control
- Front dual zone A/C
- Rear air conditioning
- Rear dual zone A/C
- Rear window defroster
- Comfort Access keyless entry
- Heads-Up Display
- Memory seat
- Power driver seat
- Power steering
- Power windows
- Steering wheel memory
- Steering wheel mounted audio controls
- Adaptive suspension
- Four wheel independent suspension
- Speed-sensing steering
- Traction control
- 4-Wheel Disc Brakes
- ABS brakes
- Dual front impact airbags
- Dual front side impact airbags
- Emergency communication system: BMW Assist eCall
- Front anti-roll bar
- Low tire pressure warning
- M Compound Brakes w/Red Calipers
- Occupant sensing airbag
- Overhead airbag
- Rear anti-roll bar
- Soft-Close Automatic Doors
- Brake assist
- Electronic Stability Control
- Exterior Parking Camera Rear
- Rear-View Camera
- Auto High-beam Headlights
- Delay-off headlights
- Fully automatic headlights
- M Seat Belts
- Panic alarm
- Security system
- Extended Traffic Jam Assistant
- Speed control
- Auto-dimming door mirrors
- Bumpers: body-color
- Extended Shadowline Trim
- Heated door mirrors
- M Shadowline Lights
- Power door mirrors
- Spoiler
- Turn signal indicator mirrors
- Active Driving Assistant Pro
- Active Park Distance Control
- Aluminum Dark Carbon Structure Trim
- Apple CarPlay Compatibility
- Auto tilt-away steering wheel
- Auto-dimming Rear-View mirror
- BMW Assist eCall
- BMW TeleServices
- ConnectedDrive Services
- Drive Recorder
- Driver door bin
- Driver vanity mirror
- Front reading lights
- Gesture Control
- Heated steering wheel
- Illuminated entry
- Leather Shift Knob
- Leather steering wheel
- Live Cockpit Pro w/Navi
- Outside temperature display
- Parking Assistant Plus
- Passenger vanity mirror
- Rear reading lights
- Rear seat center armrest
- Sport steering wheel
- Surround View w/3D View
- Tachometer
- Telescoping steering wheel
- Tilt steering wheel
- Trip computer
- Universal garage-door opener
- WiFi Hotspot
- Wireless Charging
- Extended Merino Leather Upholstery
- Front & Rear Heated Seats
- Front Bucket Seats
- Front Center Armrest
- Front Massaging Seats
- Front Ventilated Seats
- Heated Front Seats
- Heated front seats
- Multi-Function Seats w/Lumbar Support
- Power Front Seats
- Power passenger seat
- Split folding rear seat
- Passenger door bin
- Alloy wheels
- Wheels: 19" x 9.5" Fr & 19" x 10.5" Rr Bi-Color
- Wheels: 20" x 9.5" Fr & 20" x 10.5" Rr Black
- Wheels: 20" x 9.5" Fr & 20" x 10.5" Rr M Y-Spoke
- Power Rear Sunshade & Rear Side Window Shades
- Rain sensing wipers
- Speed-Sensitive Wipers
- Variably intermittent wipers
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.