2023 BMW M4 Competition at Irvine BMW
https://research.irvinebmw.com/cars/Used/2023/BMW/M4/Competition/168797012023 BMW M4 Competition
Selling Price: $69,888
Photo Gallery
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 20,930
- VIN : WBS43AZ03PCL68031
- Stock # : L42757
- Engine :
- Transmission : 8-Speed Automatic Steptronic
- Ext. Color : Yellow
- Int. Color : Black
- Vehicle Type : Coupe
- Body Style : 2D Coupe
- Drivetrain : AWD
City MPG *
16
Hwy MPG *
22
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
This 2023 Sao Paulo Yellow BMW M4 Competition AWD is well equipped and includes these features and benefits.Executive Package (Head-Up Display, Heated Steering Wheel, Power Tailgate, and Remote Engine Start), M Carbon Exterior Package, Live Cockpit Pro (incl. Navi), 16 Speakers, 4-Wheel Disc Brakes, ABS brakes, Adaptive suspension, Air Conditioning, Alloy wheels, AM/FM radio: SiriusXM, Apple CarPlay Compatibility, Auto High-beam Headlights, Auto-dimming door mirrors, Auto-dimming Rear-View mirror, Automatic temperature control, BMW Assist eCall, BMW TeleServices, Brake assist, Bumpers: body-color, Carbon Fiber Trim, Comfort Access keyless entry, Compass, ConnectedDrive Services, Delay-off headlights, Driver door bin, Driver vanity mirror, Dual front impact airbags, Dual front side impact airbags, Electronic Stability Control, Emergency communication system: BMW Assist eCall, Enhanced USB/Bluetooth Plus Smartphone Integration, Extended Merino Leather Upholstery, Exterior Parking Camera Rear, Four wheel independent suspension, Front anti-roll bar, Front Bucket Seats, Front Center Armrest, Front dual zone A/C, Front reading lights, Fully automatic headlights, harman/kardon Surround Sound System, harman/kardon Speakers, Heated door mirrors, Heated Front Seats, Heated front seats, Illuminated entry, Knee airbag, Leather Shift Knob, Live Cockpit Pro w/Navi, Low tire pressure warning, Lumbar Support, M Compound Brakes w/Red Calipers, M Shadowline Lights, M Sport Seats, Memory seat, Occupant sensing airbag, Outside temperature display, Overhead airbag, Overhead console, Panic alarm, Passenger door bin, Passenger vanity mirror, Power door mirrors, Power driver seat, Power Front Seats, Power passenger seat, Power steering, Power windows, Radio data system, Radio: AM/FM Audio System, Rain sensing wipers, Rear air conditioning, Rear anti-roll bar, Rear reading lights, Rear seat center armrest, Rear window defroster, Security system, SiriusXM Satellite Radio, Speed control, Speed-sensing steering, Speed-Sensitive Wipers, Split folding rear seat, Spoiler, Sport steering wheel, Steering wheel mounted audio controls, Tachometer, Telescoping steering wheel, Tilt steering wheel, Traction control, Trip computer, Turn signal indicator mirrors, Universal garage-door opener, Variably intermittent wipers, Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M), Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Silver, and WiFi Hotspot. CARFAX One-Owner.
Vehicle Features
- Live Cockpit Pro (incl. Navi)
- Executive Package
- M Carbon Exterior Package
- 16 Speakers
- AM/FM radio: SiriusXM
- harman/kardon Surround Sound System
- harman/kardon® Speakers
- Radio data system
- Radio: AM/FM Audio System
- SiriusXM Satellite Radio
- Air Conditioning
- Automatic temperature control
- Front dual zone A/C
- Rear air conditioning
- Rear window defroster
- Comfort Access keyless entry
- Head-Up Display
- Lumbar Support
- Memory seat
- Power driver seat
- Power steering
- Power windows
- Remote Engine Start
- Steering wheel mounted audio controls
- Adaptive suspension
- Four wheel independent suspension
- Speed-sensing steering
- Traction control
- 4-Wheel Disc Brakes
- ABS brakes
- Dual front impact airbags
- Dual front side impact airbags
- Emergency communication system: BMW Assist eCall
- Front anti-roll bar
- Knee airbag
- Low tire pressure warning
- M Compound Brakes w/Red Calipers
- Occupant sensing airbag
- Overhead airbag
- Rear anti-roll bar
- Power Tailgate
- Brake assist
- Electronic Stability Control
- Exterior Parking Camera Rear
- Auto High-beam Headlights
- Delay-off headlights
- Fully automatic headlights
- Panic alarm
- Security system
- Speed control
- Auto-dimming door mirrors
- Bumpers: body-color
- Heated door mirrors
- M Shadowline Lights
- Power door mirrors
- Spoiler
- Turn signal indicator mirrors
- Apple CarPlay Compatibility
- Auto-dimming Rear-View mirror
- BMW Assist eCall
- BMW TeleServices
- Carbon Fiber Trim
- Compass
- ConnectedDrive Services
- Driver door bin
- Driver vanity mirror
- Enhanced USB/Bluetooth Plus Smartphone Integration
- Front reading lights
- Heated Steering Wheel
- Illuminated entry
- Leather Shift Knob
- Live Cockpit Pro w/Navi
- Outside temperature display
- Overhead console
- Passenger vanity mirror
- Rear reading lights
- Rear seat center armrest
- Sport steering wheel
- Tachometer
- Telescoping steering wheel
- Tilt steering wheel
- Trip computer
- Universal garage-door opener
- WiFi Hotspot
- Extended Merino Leather Upholstery
- Front Bucket Seats
- Front Center Armrest
- Heated Front Seats
- Heated front seats
- M Sport Seats
- Power Front Seats
- Power passenger seat
- Split folding rear seat
- Passenger door bin
- Alloy wheels
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Silver
- Rain sensing wipers
- Speed-Sensitive Wipers
- Variably intermittent wipers
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.