2023 BMW M3 Competition at Irvine BMW
https://research.irvinebmw.com/cars/Used/2023/BMW/M3/Competition/167858532023 BMW M3 Competition
Selling Price: $83,888
Photo Gallery
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 21,309
- VIN : WBS43AY09PFR41238
- Stock # : X77372A
- Engine :
- Transmission : 8-Speed Automatic Steptronic
- Ext. Color : Gray
- Int. Color : Black
- Vehicle Type : Sedan
- Body Style : 4D Sedan
- Drivetrain : AWD
City MPG *
16
Hwy MPG *
22
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
This 2023 Individual Dravit Gray Metallic BMW M3 Competition AWD is well equipped and includes these features and benefits. Clean CARFAX. CARFAX One-Owner.
Vehicle Features
- Live Cockpit Pro (incl. Navi)
- Connected Package Pro
- Executive Package
- Parking Assistance Package
- 16 Speakers
- AM/FM radio: SiriusXM
- harman/kardon Surround Sound System
- harman/kardon® Speakers
- Radio data system
- Radio: AM/FM Audio System
- SiriusXM Satellite Radio
- Air Conditioning
- Automatic temperature control
- Front dual zone A/C
- Rear air conditioning
- Rear window defroster
- Comfort Access keyless entry
- Lumbar Support
- Memory seat
- Power driver seat
- Power steering
- Power windows
- Remote Engine Start
- Steering wheel mounted audio controls
- Adaptive suspension
- Four wheel independent suspension
- Speed-sensing steering
- Traction control
- 4-Wheel Disc Brakes
- ABS brakes
- Dual front impact airbags
- Dual front side impact airbags
- Emergency communication system: BMW Assist eCall
- Front anti-roll bar
- Knee airbag
- Low tire pressure warning
- M Compound Brakes w/Black Calipers
- Occupant sensing airbag
- Overhead airbag
- Rear anti-roll bar
- Power Tailgate
- Brake assist
- Electronic Stability Control
- Exterior Parking Camera Rear
- Auto High-beam Headlights
- Delay-off headlights
- Fully automatic headlights
- Panic alarm
- Security system
- Speed control
- Auto-dimming door mirrors
- Bumpers: body-color
- Heated door mirrors
- Icon Adaptive LED Headlights w/Laserlight
- M Shadowline Lights
- Parking Assistant Plus
- Power door mirrors
- Spoiler
- Turn signal indicator mirrors
- Apple CarPlay Compatibility
- Auto-dimming Rear-View mirror
- BMW Assist eCall
- BMW Curved Display
- BMW Head Up Display
- BMW TeleServices
- Carbon Fiber Trim
- Compass
- ConnectedDrive Services
- Drive Recorder
- Driver door bin
- Driver vanity mirror
- Enhanced USB & Bluetooth Plus Smartphone Integration
- Front reading lights
- Heated Steering Wheel
- Illuminated entry
- Leather Shift Knob
- Outside temperature display
- Passenger vanity mirror
- Rear reading lights
- SensaTec Dashboard
- Sport steering wheel
- Tachometer
- Telescoping steering wheel
- Tilt steering wheel
- Trip computer
- Universal garage-door opener
- Wireless Device Charging
- Extended Merino Leather Upholstery
- Front Bucket Seats
- Front Center Armrest
- Heated Front Seats
- Heated front seats
- M Sport Seats
- Power Front Seats
- Power passenger seat
- Split folding rear seat
- Passenger door bin
- Alloy wheels
- Wheels: 19"x9.5" Fr. & 20"x10.5" Rr. Orbit Gray
- Wheels: 19"x9.5" Fr.&20"x10.5"Rr. M Bi-color (1T8)
- Rain sensing wipers
- Speed-Sensitive Wipers
- Variably intermittent wipers
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.