Irvine BMW
9881 Research Drive Irvine, CA 92618

2022 BMW M4 Competition xDrive at Irvine BMW

2022 BMW M4 Competition xDrive

Selling Price: $65,888

Photo Gallery

Vehicle Basics

  • Vehicle Make : BMW
  • Vehicle Model : M4
  • Condition : Used
  • Mileage : 29,910
  • VIN : WBS33BA08NCJ40911
  • Stock # : C77313A
  • Engine : Straight 6 Cylinder Engine
  • Transmission : 8-Speed A/T
  • Ext. Color : Alpine White
  • Int. Color : Black
  • Vehicle Type : Convertible
  • Body Style : 2D Convertible
  • Drivetrain : All Wheel Drive
City MPG * 16 Hwy MPG * 23

*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.

This 2022 Alpine White BMW M4 Competition AWD is well equipped and includes these features and benefits.Driving Assistance Professional Package (Active Driving Assistant Pro and Extended Traffic Jam Assistant), Executive Package (Head-Up Display, Heated Steering Wheel, and Remote Engine Start), Live Cockpit Pro (incl. Navi), 16 Speakers, 4-Wheel Disc Brakes, ABS brakes, Adaptive suspension, Air Conditioning, Alloy wheels, AM/FM radio: SiriusXM with 360L, Apple CarPlay Compatibility, Auto High-beam Headlights, Auto-dimming door mirrors, Auto-dimming Rear-View mirror, Automatic temperature control, BMW Assist eCall, BMW TeleServices, Brake assist, Bumpers: body-color, Comfort Access keyless entry, Compass, ConnectedDrive Services, Convertible roof lining, Convertible roof wind blocker, Delay-off headlights, Driver door bin, Driver vanity mirror, Dual front impact airbags, Dual front side impact airbags, Electronic Stability Control, Emergency communication system: BMW Assist eCall, Enhanced Bluetooth, Extended Merino Leather Upholstery, Exterior Parking Camera Rear, Four wheel independent suspension, Front anti-roll bar, Front Bucket Seats, Front Center Armrest, Front dual zone A/C, Front reading lights, Front Ventilated Seats, Fully automatic headlights, Glass rear window, harman/kardon Surround Sound System, harman/kardon Speakers, Heated door mirrors, Heated Front Seats, Heated front seats, Illuminated entry, Individual Piano Black Finish Trim, Integrated roll-over protection, Knee airbag, Leather Shift Knob, Live Cockpit Pro w/Navi, Low tire pressure warning, Lumbar Support, M Compound Brakes w/Red Calipers, M Shadowline Lights, M Sport Seats, Memory seat, Neck Warmer, Occupant sensing airbag, Outside temperature display, Overhead console, Panic alarm, Passenger door bin, Passenger vanity mirror, Power convertible roof, Power door mirrors, Power driver seat, Power Front Seats, Power passenger seat, Power steering, Power windows, Radio data system, Radio: AM/FM Audio System, Rain sensing wipers, Rear air conditioning, Rear anti-roll bar, Rear reading lights, Rear seat center armrest, Rear window defroster, Security system, SiriusXM, Speed control, Speed-sensing steering, Speed-Sensitive Wipers, Sport steering wheel, Steering wheel mounted audio controls, Tachometer, Telescoping steering wheel, Tilt steering wheel, Traction control, Trip computer, Turn signal indicator mirrors, Universal garage-door opener, Variably intermittent wipers, Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M), and Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Silver. Clean CARFAX. CARFAX One-Owner.

Browse Other Vehicles at Irvine BMW

Dealership Info

BMW logo

Irvine BMW

Irvine BMW

Vehicle Features

  • Engine: 3.0L 6-Cylinder TwinPower Turbo
  • Transmission: 8-Speed STEPTRONIC Automatic
  • Engine Auto Stop-Start Feature
  • Transmission w/Driver Selectable Mode and Oil Cooler
  • Full-Time All-Wheel
  • 3.15 Axle Ratio
  • Engine Oil Cooler
  • 70-Amp/Hr Maintenance-Free Battery w/Run Down Protection
  • Regenerative Alternator
  • Gas-Pressurized Shock Absorbers
  • Front And Rear Anti-Roll Bars
  • Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
  • Electric Power-Assist Speed-Sensing Steering
  • 15.6 Gal. Fuel Tank
  • Dual Stainless Steel Exhaust w/Dark Chrome Tailpipe Finisher
  • Strut Front Suspension w/Coil Springs
  • Multi-Link Rear Suspension w/Coil Springs
  • 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
  • Electro-Mechanical Limited Slip Differential
  • Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M) -inc: M double-spoke bi-color
  • Tires: 275/35R19 Fr & 285/30R20 Rr Performance -inc: Non run-flat
  • Tire Mobility Kit
  • Clearcoat Paint
  • Body-Colored Front Bumper
  • Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
  • Rocker Panel Extensions
  • Black Side Windows Trim and Black Front Windshield Trim
  • Body-Colored Door Handles
  • Black Power Heated Side Mirrors w/Driver Auto Dimming, Power Folding and Turn Signal Indicator
  • Fixed Rear Window w/Defroster
  • Light Tinted Glass
  • Speed Sensitive Rain Detecting Variable Intermittent Wipers
  • Galvanized Steel/Aluminum/Composite Panels
  • Lip Spoiler
  • Black Grille
  • Front License Plate Bracket
  • Power Convertible Top w/Lining, Glass Rear Window, Automatic Roll-Over Protection and Manual Wind Blocker
  • Trunk Rear Cargo Access
  • Auto On/Off Projector Beam Led Low/High Beam Daytime Running Auto-Leveling Auto High-Beam Headlamps w/Delay-Off
  • Cornering Lights
  • Perimeter/Approach Lights
  • LED Brakelights
  • Headlights-Automatic Highbeams
  • Radio: AM/FM Audio System -inc: Apple CarPlay & Android Auto Compatibility
  • Radio w/Seek-Scan, Clock, Speed Compensated Volume Control, Steering Wheel Controls, Voice Activation, Radio Data System, External Memory Control and 20 Gb Internal Memory
  • 16 Speakers
  • 600w Premium Amplifier
  • Streaming Audio
  • SiriusXM w/360L -inc: 1 year platinum plan subscription
  • harman/kardon Surround Sound System
  • Window Grid Diversity Antenna
  • 2 LCD Monitors In The Front
  • Artti Real-Time Traffic Display
  • M Sport Seats -inc: Heated Front Seats
  • Power Front Seats
  • 12-Way Driver Seat -inc: Manual Cushion Extension and Power Rear Seat Easy Entry
  • 12-Way Passenger Seat -inc: Manual Cushion Extension and Power Rear Seat Easy Entry
  • Bucket Front Facing Rear Seat
  • Manual Tilt/Telescoping Steering Column
  • Gauges -inc: Speedometer, Odometer, Engine Coolant Temp, Tachometer, Trip Odometer and Trip Computer
  • Power Rear Windows
  • Sport Leather/Metal-Look Steering Wheel
  • Front Cupholder
  • Rear Cupholder
  • Compass
  • Proximity Key For Doors And Push Button Start
  • Valet Function
  • Power Fuel Flap Locking Type
  • Remote Keyless Entry w/Integrated Key Transmitter, 2 Door Curb/Courtesy, Illuminated Entry, Illuminated Ignition Switch and Panic Button
  • Remote Releases -Inc: Proximity Cargo Access
  • Garage Door Transmitter
  • Cruise Control w/Steering Wheel Controls
  • Dual Zone Front Automatic Air Conditioning
  • Rear HVAC w/Separate Controls
  • HVAC -inc: Underseat Ducts and Console Ducts
  • Illuminated Locking Glove Box
  • Driver Foot Rest
  • Interior Trim -inc: Aluminum Instrument Panel Insert and Metal-Look Interior Accents
  • Full Cloth Headliner
  • Leatherette Door Trim Insert
  • Leather/Metal-Look Gear Shifter Material
  • Extended Merino Leather Upholstery
  • Day-Night Auto-Dimming Rearview Mirror
  • Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination, Driver And Passenger Auxiliary Mirror
  • Full Floor Console w/Covered Storage and 3 12V DC Power Outlets
  • Front And Rear Map Lights
  • Fade-To-Off Interior Lighting
  • Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
  • Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
  • Cargo Area Concealed Storage
  • Cargo Features -inc: Tire Mobility Kit
  • Cargo Space Lights
  • Memory Settings -inc: Driver Seat and Door Mirrors
  • Tracker System
  • Smart Device Integration
  • BMW Assist eCall
  • ConnectedDrive Services
  • Enhanced Bluetooth
  • FOB Controls -inc: Cargo Access, Windows and Sunroof/Convertible Roof
  • Instrument Panel Covered Bin, Driver And Passenger Door Bins
  • Delayed Accessory Power
  • Power Door Locks w/Autolock Feature
  • Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
  • Systems Monitor
  • Redundant Digital Speedometer
  • Trip Computer
  • Outside Temp Gauge
  • BMW TeleServices
  • Live Cockpit Pro w/Navi
  • Driver And Passenger Heated-Cushion, Driver And Passenger Heated-Seatback
  • Lumbar Support
  • Manual Adjustable Front Head Restraints and Manual Adjustable Rear Head Restraints
  • Front Center Armrest and Rear Center Armrest w/Pass-Thru w/Storage
  • Perimeter Alarm
  • Engine Immobilizer
  • 3 12V DC Power Outlets
  • Air Filtration
  • DSC Electronic Stability Control (ESC)
  • ABS And Driveline Traction Control
  • Side Impact Beams
  • Dual Stage Driver And Passenger Seat-Mounted Side Airbags
  • Park Distance Control Front And Rear Parking Sensors
  • Blind Spot Detection Blind Spot
  • Forward Collision Mitigation
  • Lane Departure Warning
  • Collision Mitigation-Front
  • Driver Monitoring-Alert
  • Collision Mitigation-Rear
  • Tire Specific Low Tire Pressure Warning
  • Dual Stage Driver And Passenger Front Airbags
  • Airbag Occupancy Sensor
  • Outboard Front Lap And Shoulder Safety Belts -inc: Pretensioners
  • Driver And Passenger Side Airbag Head Extension, Driver And Passenger Knee Airbag
  • Back-Up Camera
  • Live Cockpit Pro (incl. Navi)
  • Driving Assistance Professional Package
  • Executive Package
  • 16 Speakers
  • AM/FM radio: SiriusXM with 360L
  • harman/kardon Surround Sound System
  • harman/kardon® Speakers
  • Radio data system
  • Radio: AM/FM Audio System
  • SiriusXM
  • Air Conditioning
  • Automatic temperature control
  • Front dual zone A/C
  • Neck Warmer
  • Rear air conditioning
  • Rear window defroster
  • Comfort Access keyless entry
  • Head-Up Display
  • Lumbar Support
  • Memory seat
  • Power driver seat
  • Power steering
  • Power windows
  • Remote Engine Start
  • Steering wheel mounted audio controls
  • Adaptive suspension
  • Four wheel independent suspension
  • Speed-sensing steering
  • Traction control
  • 4-Wheel Disc Brakes
  • ABS brakes
  • Dual front impact airbags
  • Dual front side impact airbags
  • Emergency communication system: BMW Assist eCall
  • Front anti-roll bar
  • Integrated roll-over protection
  • Knee airbag
  • Low tire pressure warning
  • M Compound Brakes w/Red Calipers
  • Occupant sensing airbag
  • Rear anti-roll bar
  • Brake assist
  • Electronic Stability Control
  • Exterior Parking Camera Rear
  • Auto High-beam Headlights
  • Delay-off headlights
  • Fully automatic headlights
  • Panic alarm
  • Security system
  • Active Driving Assistant Pro
  • Extended Traffic Jam Assistant
  • Speed control
  • Auto-dimming door mirrors
  • Bumpers: body-color
  • Convertible roof wind blocker
  • Heated door mirrors
  • M Shadowline Lights
  • Power door mirrors
  • Turn signal indicator mirrors
  • Apple CarPlay Compatibility
  • Auto-dimming Rear-View mirror
  • BMW Assist eCall
  • BMW TeleServices
  • Compass
  • ConnectedDrive Services
  • Convertible roof lining
  • Driver door bin
  • Driver vanity mirror
  • Enhanced Bluetooth
  • Front reading lights
  • Heated Steering Wheel
  • Illuminated entry
  • Individual Piano Black Finish Trim
  • Leather Shift Knob
  • Live Cockpit Pro w/Navi
  • Outside temperature display
  • Overhead console
  • Passenger vanity mirror
  • Power convertible roof
  • Rear reading lights
  • Rear seat center armrest
  • Sport steering wheel
  • Tachometer
  • Telescoping steering wheel
  • Tilt steering wheel
  • Trip computer
  • Universal garage-door opener
  • Extended Merino Leather Upholstery
  • Front Bucket Seats
  • Front Center Armrest
  • Front Ventilated Seats
  • Heated Front Seats
  • Heated front seats
  • M Sport Seats
  • Power Front Seats
  • Power passenger seat
  • Passenger door bin
  • Alloy wheels
  • Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
  • Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Silver
  • Glass rear window
  • Rain sensing wipers
  • Speed-Sensitive Wipers
  • Variably intermittent wipers
  • Rear Spoiler

Disclaimer & Legal Info

Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.