2015 BMW M4 Base at Irvine BMW
https://research.irvinebmw.com/cars/Used/2015/BMW/M4/Base/166732352015 BMW M4 Base
Selling Price: $53,888
Photo Gallery
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 18,225
- VIN : WBS3R9C54FK330227
- Stock # : C76695A
- Engine :
- Transmission : 6-Speed Manual
- Ext. Color : White
- Int. Color : Black
- Vehicle Type : Coupe
- Body Style : 2D Coupe
- Drivetrain : RWD
City MPG *
17
Hwy MPG *
26
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
This 2015 Alpine White BMW M4 Base RWD is well equipped and includes these features and benefits. Clean CARFAX. CARFAX One-Owner.
Vehicle Features
- Live Cockpit Pro (incl. Navi)
- 9 Speakers
- AM/FM radio
- CD player
- DVD-Audio
- Harman/Kardon Surround Sound System
- Radio data system
- Radio: AM/FM Audio System
- Satellite Radio
- Air Conditioning
- Automatic temperature control
- Front dual zone A/C
- Rear air conditioning
- Rear window defroster
- Comfort Access Keyless Entry
- Comfort Access keyless entry
- Head-Up Display
- Memory seat
- Power driver seat
- Power steering
- Power windows
- Steering wheel mounted audio controls
- Adaptive M Suspension
- Four wheel independent suspension
- Speed-sensing steering
- Traction control
- 4-Wheel Disc Brakes
- ABS brakes
- Dual front impact airbags
- Dual front side impact airbags
- Emergency communication system
- Front anti-roll bar
- Knee airbag
- Low tire pressure warning
- Occupant sensing airbag
- Overhead airbag
- Rear anti-roll bar
- Active Blind Spot Detection
- Brake assist
- Electronic Stability Control
- Rear-View Camera
- Automatic High Beams
- Delay-off headlights
- Fully automatic headlights
- High intensity discharge headlights: Bi-xenon
- Retractable Headlight Washers
- Panic alarm
- Security system
- Speed control
- Adaptive Full LED Lights
- Auto-dimming door mirrors
- Bumpers: body-color
- Heated door mirrors
- Power door mirrors
- Turn signal indicator mirrors
- Active Driving Assistant
- Auto-dimming Rear-View mirror
- Black Chrome Highlight Trim Finishers
- Driver door bin
- Driver vanity mirror
- Enhanced USB & Bluetooth w/Smartphone Integration
- Front reading lights
- Heated Steering Wheel
- Illuminated entry
- Leather Shift Knob
- Leather steering wheel
- Outside temperature display
- Park Distance Control
- Passenger vanity mirror
- Rear reading lights
- Rear seat center armrest
- Side & Top View Cameras
- Speed Limit Info
- Sport steering wheel
- Tachometer
- Telescoping steering wheel
- Tilt steering wheel
- Trip computer
- Universal garage-door opener
- Cloth/Leather Upholstery
- Front Bucket Seats
- Front Center Armrest
- Heated front seats
- Heated Front Sport Seats
- Power passenger seat
- Split folding rear seat
- Passenger door bin
- Alloy wheels
- Wheels: 18" x 9" Front & 18" x 10" Rear
- Wheels: 19" x 9" Fr/19" x 10" Rr Black Light-Alloy
- Manual Rear Side Window Shades
- Power Rear Sunshade
- Rain sensing wipers
- Speed-Sensitive Wipers
- Variably intermittent wipers
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.