Irvine BMW
9881 Research Drive Irvine, CA 92618

2026 BMW M5 Base at Irvine BMW

2026 BMW M5 Base

Call for Pricing

Photo Gallery

Vehicle Basics

  • Vehicle Make : BMW
  • Vehicle Model : M5
  • Condition : New
  • Mileage : 13
  • VIN : WBS83FK00TCW43938
  • Stock # : C77156
  • Engine :
  • Transmission : 8-Speed Automatic Sport
  • Ext. Color : Unreleased
  • Int. Color : Black
  • Vehicle Type : Sedan
  • Body Style : 4D Sedan
  • Drivetrain : AWD
City MPG * 0 Hwy MPG * 0

*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.

Special Order Color 2026 BMW M5 AWD 8-Speed Automatic Sport 4.4L V8 Turbocharged DOHC 32V LEV3-SULEV30 Black Leather.

Browse Other Vehicles at Irvine BMW

Dealership Info

BMW logo

Irvine BMW

Irvine BMW

Vehicle Features

  • Wheels: 20" x 10.5" Fr & 21" x 11" Rr M Dual-Spoke
  • Wheels: 20" x 10.5" Fr & 21" x 11" Rr Jet Black
  • M Multi-Function Seats
  • Merino Leather Upholstery
  • Front Ventilated Seats
  • Front & Rear Heated Seats
  • Radio: AM/FM Audio System
  • Driving Assistance Professional Package
  • Carbon Package
  • Executive Package
  • M Drive Professional
  • BMW Iconic Glow Kidney Grille
  • M Compound Brakes w/Black Calipers
  • Carbon Fiber Silver Thread High Gloss Trim
  • M Driver's Package
  • Power Rear Sunshade & Rear Side Window Shades
  • Power Front Seats
  • Heated Front Seats
  • Interior Camera
  • Driving Assistant Professional
  • Parking Assistant Plus
  • SiriusXM w/360L & 1 Year Trial Subscription
  • BMW Assist eCall
  • BMW TeleServices
  • ConnectedDrive Services
  • Connected Package Pro Limited Term
  • Bowers & Wilkins Surround Sound
  • Wireless Device Charging
  • Personal eSIM 5G
  • BMW Curved Display w/HUD
  • M Carbon Exterior Package
  • Carbon Fiber Reinforced Polymer Roof
  • Mirror Caps
  • Spoiler
  • Apple CarPlay Compatibility
  • Traffic Jam Assistant
  • Lane Change Assistant
  • Partial Automated Driving
  • Parking View w/3D View (Surround View)
  • 4-Wheel Disc Brakes
  • Emergency communication system: BMW Assist eCall
  • AM/FM radio: SiriusXM with 360L
  • Auto High-beam Headlights
  • Exterior Parking Camera Rear
  • Speed-Sensitive Wipers
  • Heads-Up Display
  • 18 Speakers
  • Auto-dimming Rear-View mirror
  • Front beverage holders
  • Variably intermittent wipers
  • Turn signal indicator mirrors
  • Trip computer
  • Traction control
  • Tilt steering wheel
  • Telescoping steering wheel
  • Steering wheel mounted audio controls
  • Steering wheel memory
  • Sport steering wheel
  • Split folding rear seat
  • Speed-sensing steering
  • Speed control
  • Security system
  • Comfort Access keyless entry
  • Rear window defroster
  • Rear seat center armrest
  • Rear reading lights
  • Rear dual zone A/C
  • Rear anti-roll bar
  • Rear air conditioning
  • Rain sensing wipers
  • Radio data system
  • Power windows
  • Power steering
  • Power passenger seat
  • Power driver seat
  • Power door mirrors
  • Passenger vanity mirror
  • Passenger door bin
  • Panic alarm
  • Overhead airbag
  • Outside temperature display
  • Occupant sensing airbag
  • Memory seat
  • Low tire pressure warning
  • Leather steering wheel
  • Illuminated entry
  • Heated steering wheel
  • Heated front seats
  • Heated door mirrors
  • Universal garage-door opener
  • Fully automatic headlights
  • Front reading lights
  • Front dual zone A/C
  • Front anti-roll bar
  • Four wheel independent suspension
  • Dual front side impact airbags
  • Dual front impact airbags
  • Driver vanity mirror
  • Driver door bin
  • Delay-off headlights
  • Bumpers: body-color
  • Brake assist
  • Automatic temperature control
  • Auto-dimming door mirrors
  • Auto tilt-away steering wheel
  • Alloy wheels
  • Adaptive suspension
  • ABS brakes
  • Tachometer
  • Live Cockpit Pro (incl. Navi)
  • Front Center Armrest
  • Front Bucket Seats
  • Electronic Stability Control
  • Air Conditioning

Disclaimer & Legal Info

Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.