Irvine BMW
9881 Research Drive Irvine, CA 92618

2026 BMW M4 Competition at Irvine BMW

2026 BMW M4 Competition

Call for Pricing

Photo Gallery

Vehicle Basics

  • Vehicle Make : BMW
  • Vehicle Model : M4
  • Condition : New
  • Mileage : 15
  • VIN : WBS23HK08TCW70841
  • Stock # : C77374
  • Engine :
  • Transmission : 8-Speed Automatic Sport
  • Ext. Color : Green
  • Int. Color : Tartufo
  • Vehicle Type : Coupe
  • Body Style : 2D Coupe
  • Drivetrain : RWD
City MPG * 16 Hwy MPG * 23

*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.

Isle of Man Green Metallic 2026 BMW M4 Competition RWD 8-Speed Automatic Sport 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 523hp

Recent Arrival!

Browse Other Vehicles at Irvine BMW

Dealership Info

BMW logo

Irvine BMW

Irvine BMW

Vehicle Features

  • Remote Engine Start
  • Wheels: 19" x 9.5" Front/20" x 10.5" Rear (style 826M)
  • Wheels: 19" x 9.5" Front/20" x 10.5" Rear Forged Black
  • M Compound Brakes with Red Calipers
  • Power Front Seats
  • Lumbar Support
  • Heated Front Seats
  • Carbon Fiber Trim
  • Galvanic Controls
  • Parking Assistant Plus
  • SiriusXM with 360L and 1 Year Trial Subscription
  • Harman/Kardon Surround Sound System
  • BMW Assist ECall
  • BMW TeleServices
  • ConnectedDrive Services
  • Connected Package Pro Limited Term
  • Personal ESIM 5G
  • Navigation
  • Live Cockpit Pro with Navigation
  • Widescreen Display
  • M Alcantara Steering Wheel
  • M Sport Seats
  • M Carbon Exterior Package
  • Training Service Fee
  • Radio: AM/FM Audio System
  • Individual High-Gloss Black M Graphic Trim
  • Apple CarPlay and Android Auto Compatibility
  • Parking Assistance Package
  • Executive Package
  • Parking View with 3D View (Surround View)
  • 4-Wheel Disc Brakes
  • Emergency communication system: BMW Assist eCall
  • AM/FM radio: SiriusXM with 360L
  • harman/kardon® Speakers
  • Auto High-beam Headlights
  • Exterior Parking Camera Rear
  • Compass
  • 16 Speakers
  • Speed-Sensitive Wipers
  • Auto-dimming Rear-View mirror
  • Variably intermittent wipers
  • Turn signal indicator mirrors
  • Trip computer
  • Traction control
  • Tilt steering wheel
  • Telescoping steering wheel
  • Steering wheel mounted audio controls
  • Sport steering wheel
  • Split folding rear seat
  • Speed-sensing steering
  • Speed control
  • Security system
  • Comfort Access keyless entry
  • Rear window defroster
  • Rear seat center armrest
  • Rear reading lights
  • Rear anti-roll bar
  • Rain sensing wipers
  • Radio data system
  • Power windows
  • Power steering
  • Power passenger seat
  • Power driver seat
  • Power door mirrors
  • Passenger vanity mirror
  • Passenger door bin
  • Panic alarm
  • Overhead console
  • Overhead airbag
  • Outside temperature display
  • Occupant sensing airbag
  • Memory seat
  • Low tire pressure warning
  • Leather steering wheel
  • Knee airbag
  • Illuminated entry
  • Heated steering wheel
  • Heated front seats
  • Heated door mirrors
  • HVAC memory
  • Universal garage-door opener
  • Fully automatic headlights
  • Front reading lights
  • Front dual zone A/C
  • Front anti-roll bar
  • Four wheel independent suspension
  • Dual front side impact airbags
  • Dual front impact airbags
  • Driver vanity mirror
  • Driver door bin
  • Delay-off headlights
  • Bumpers: body-color
  • Brake assist
  • Automatic temperature control
  • Auto-dimming door mirrors
  • Audio memory
  • Alloy wheels
  • Adaptive suspension
  • ABS brakes
  • Tachometer
  • Spoiler
  • Live Cockpit Pro (incl. Navi)
  • Leather Shift Knob
  • Front Center Armrest
  • Front Bucket Seats
  • Electronic Stability Control
  • Air Conditioning

Disclaimer & Legal Info

Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.