2026 BMW M4 Competition at Irvine BMW
https://research.irvinebmw.com/cars/New/2026/BMW/M4/Competition/163574712026 BMW M4 Competition
Call for Pricing
Photo Gallery
Vehicle Basics
Additional Incentives
- Condition : New
- Mileage : 17
- VIN : WBS33HK01TCV89538
- Stock # : C76608
- Engine :
- Transmission : 8-Speed Automatic Sport
- Ext. Color : Gray
- Int. Color : Black
- Vehicle Type : Coupe
- Body Style : 2D Coupe
- Drivetrain : AWD
City MPG *
16
Hwy MPG *
23
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
Dravit Gray Metallic 2026 BMW M4 Competition AWD 8-Speed Automatic Sport 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 523hp
Vehicle Features
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Forged Black
- M Sport Seats
- Extended Merino Leather Upholstery
- Front Ventilated Seats
- Radio: AM/FM Audio System
- Driving Assistance Professional Package
- Parking Assistance Package
- Executive Package
- M Drive Professional
- M Compound Brakes w/Red Calipers
- M Shadowline Lights
- Carbon Fiber Trim
- Galvanic Controls
- Remote Engine Start
- Power Front Seats
- Lumbar Support
- Heated Front Seats
- Traffic Jam Assistant
- Driving Assistant Professional
- Parking Assistant Plus
- SiriusXM w/360L & 1 Year Trial Subscription
- harman/kardon Surround Sound System
- BMW Assist eCall
- BMW TeleServices
- ConnectedDrive Services
- Connected Package Pro Limited Term
- Personal eSIM 5G
- Navigation
- Live Cockpit Pro w/Navigation
- Widescreen Display
- Apple CarPlay Compatibility
- Distance Control Assist (DCA) w/Steering Assistant
- Partial Automated Driving
- Parking View w/3D View (Surround View)
- 4-Wheel Disc Brakes
- Emergency communication system: BMW Assist eCall
- AM/FM radio: SiriusXM with 360L
- harman/kardon® Speakers
- Auto High-beam Headlights
- Exterior Parking Camera Rear
- Compass
- 16 Speakers
- Speed-Sensitive Wipers
- Auto-dimming Rear-View mirror
- Front beverage holders
- Variably intermittent wipers
- Turn signal indicator mirrors
- Trip computer
- Traction control
- Tilt steering wheel
- Telescoping steering wheel
- Steering wheel mounted audio controls
- Sport steering wheel
- Split folding rear seat
- Speed-sensing steering
- Speed control
- Security system
- Comfort Access keyless entry
- Rear window defroster
- Rear seat center armrest
- Rear reading lights
- Rear anti-roll bar
- Rain sensing wipers
- Radio data system
- Power windows
- Power steering
- Power passenger seat
- Power driver seat
- Power door mirrors
- Passenger vanity mirror
- Passenger door bin
- Panic alarm
- Overhead console
- Overhead airbag
- Outside temperature display
- Occupant sensing airbag
- Memory seat
- Low tire pressure warning
- Leather steering wheel
- Knee airbag
- Illuminated entry
- Heated steering wheel
- Heated front seats
- Heated door mirrors
- HVAC memory
- Universal garage-door opener
- Fully automatic headlights
- Front reading lights
- Front dual zone A/C
- Front anti-roll bar
- Four wheel independent suspension
- Dual front side impact airbags
- Dual front impact airbags
- Driver vanity mirror
- Driver door bin
- Delay-off headlights
- Bumpers: body-color
- Brake assist
- Automatic temperature control
- Auto-dimming door mirrors
- Audio memory
- Alloy wheels
- Adaptive suspension
- ABS brakes
- Tachometer
- Spoiler
- Live Cockpit Pro (incl. Navi)
- Leather Shift Knob
- Front Center Armrest
- Front Bucket Seats
- Electronic Stability Control
- Air Conditioning
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.