2026 BMW M3 Competition at Irvine BMW
https://research.irvinebmw.com/cars/New/2026/BMW/M3/Competition/168524222026 BMW M3 Competition
Call for Pricing
Photo Gallery
Vehicle Basics
Additional Incentives
- Condition : New
- Mileage : 10
- VIN : WBS33HJ08TFW20493
- Stock # : C77666
- Engine :
- Transmission : 8-Speed Automatic Sport
- Ext. Color : Gray
- Int. Color : Black
- Vehicle Type : Sedan
- Body Style : 4D Sedan
- Drivetrain : AWD
City MPG *
16
Hwy MPG *
23
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
Vehicle Features
- Wheels: 19" x 9.5" Front and 20" x 10.5" Rear M Black
- M Compound Brakes with Red Calipers
- M Shadowline Lights
- Power Front Seats
- Lumbar Support
- Heated Front Seats
- Carbon Fiber Trim
- Galvanic Controls
- Full LED Headlights with Cornering Lights
- Traffic Jam Assistant
- Driving Assistant Professional
- Parking Assistant Plus
- SiriusXM with 360L and 1 Year Trial Subscription
- Harman/Kardon Surround Sound System
- BMW Assist ECall
- BMW TeleServices
- ConnectedDrive Services
- Connected Package Pro Limited Term
- Drive Recorder
- Wireless Device Charging
- Navigation
- BMW Curved Display with HUD
- M Sport Seats
- M Carbon Exterior Package
- Training Service Fee
- AM/FM Radio
- Apple CarPlay and Android Auto Compatibility
- Driving Assistance Professional Package
- Distance Control (ACC) with Steering Assistant
- Partial Automated Driving
- Parking Assistance Package
- Executive Package
- Parking View with 3D View (Surround View)
- Active Park Distance Control with Side Protection
- 4-Wheel Disc Brakes
- Emergency communication system: BMW Assist eCall
- harman/kardon® Speakers
- Auto High-beam Headlights
- Exterior Parking Camera Rear
- AM/FM radio: SiriusXM
- Compass
- 16 Speakers
- Speed-Sensitive Wipers
- Auto-dimming Rear-View mirror
- Variably intermittent wipers
- Turn signal indicator mirrors
- Trip computer
- Traction control
- Tilt steering wheel
- Telescoping steering wheel
- Steering wheel mounted audio controls
- Sport steering wheel
- Split folding rear seat
- Speed-sensing steering
- Speed control
- Security system
- Comfort Access keyless entry
- Rear window defroster
- Rear reading lights
- Rear anti-roll bar
- Rear air conditioning
- Rain sensing wipers
- Radio data system
- Power windows
- Power steering
- Power passenger seat
- Power driver seat
- Power door mirrors
- Passenger vanity mirror
- Passenger door bin
- Panic alarm
- Overhead airbag
- Outside temperature display
- Occupant sensing airbag
- Memory seat
- Low tire pressure warning
- Knee airbag
- Illuminated entry
- Heated steering wheel
- Heated front seats
- Heated door mirrors
- Universal garage-door opener
- Fully automatic headlights
- Front reading lights
- Front dual zone A/C
- Front anti-roll bar
- Four wheel independent suspension
- Dual front side impact airbags
- Dual front impact airbags
- Driver vanity mirror
- Driver door bin
- Delay-off headlights
- Bumpers: body-color
- Brake assist
- Automatic temperature control
- Auto-dimming door mirrors
- Alloy wheels
- Adaptive suspension
- ABS brakes
- Tachometer
- Spoiler
- Live Cockpit Pro (incl. Navi)
- Front Center Armrest
- Front Bucket Seats
- Electronic Stability Control
- Air Conditioning
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.
Recent Arrival!