2026 BMW M3 Competition at Irvine BMW
https://research.irvinebmw.com/cars/New/2026/BMW/M3/Competition/166583552026 BMW M3 Competition
Call for Pricing
Photo Gallery
Vehicle Basics
Additional Incentives
- Condition : New
- Mileage : 12
- VIN : WBS33HJ0XTFV82619
- Stock # : C77198
- Engine :
- Transmission : 8-Speed Automatic Sport
- Ext. Color : Blue
- Int. Color : Ivory White
- Vehicle Type : Sedan
- Body Style : 4D Sedan
- Drivetrain : AWD
City MPG *
16
Hwy MPG *
23
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
Portimao Blue Metallic 2026 BMW M3 Competition AWD 8-Speed Automatic Sport 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 523hp
Vehicle Features
- Wheels: 19"x9.5" Fr.&20"x10.5"Rr. M Bi-color (1T8)
- M Sport Seats
- Extended Merino Leather Upholstery
- Front Ventilated Seats
- AM/FM Radio
- Parking Assistance Package
- Executive Package
- M Drive Professional
- Carbon Fiber Trim
- SensaTec Dashboard
- Galvanic Controls
- Power Front Seats
- Lumbar Support
- Heated Front Seats
- Full LED Headlights w/Cornering Lights
- Parking Assistant Plus
- SiriusXM w/360L & 1 Year Trial Subscription
- harman/kardon Surround Sound System
- BMW Assist eCall
- BMW TeleServices
- ConnectedDrive Services
- Connected Package Pro Limited Term
- Drive Recorder
- Wireless Device Charging
- Navigation
- BMW Curved Display w/HUD
- Apple CarPlay Compatibility
- Parking View w/3D View (Surround View)
- Active Park Distance Control w/Side Protection
- 4-Wheel Disc Brakes
- Emergency communication system: BMW Assist eCall
- harman/kardon® Speakers
- Auto High-beam Headlights
- Exterior Parking Camera Rear
- AM/FM radio: SiriusXM
- Compass
- 16 Speakers
- Speed-Sensitive Wipers
- Auto-dimming Rear-View mirror
- Front beverage holders
- Variably intermittent wipers
- Turn signal indicator mirrors
- Trip computer
- Traction control
- Tilt steering wheel
- Telescoping steering wheel
- Steering wheel mounted audio controls
- Sport steering wheel
- Split folding rear seat
- Speed-sensing steering
- Speed control
- Security system
- Comfort Access keyless entry
- Rear window defroster
- Rear reading lights
- Rear anti-roll bar
- Rear air conditioning
- Rain sensing wipers
- Radio data system
- Power windows
- Power steering
- Power passenger seat
- Power driver seat
- Power door mirrors
- Passenger vanity mirror
- Passenger door bin
- Panic alarm
- Overhead airbag
- Outside temperature display
- Occupant sensing airbag
- Memory seat
- Low tire pressure warning
- Knee airbag
- Illuminated entry
- Heated steering wheel
- Heated front seats
- Heated door mirrors
- Universal garage-door opener
- Fully automatic headlights
- Front reading lights
- Front dual zone A/C
- Front anti-roll bar
- Four wheel independent suspension
- Dual front side impact airbags
- Dual front impact airbags
- Driver vanity mirror
- Driver door bin
- Delay-off headlights
- Bumpers: body-color
- Brake assist
- Automatic temperature control
- Auto-dimming door mirrors
- Alloy wheels
- Adaptive suspension
- ABS brakes
- Tachometer
- Spoiler
- Live Cockpit Pro (incl. Navi)
- Front Center Armrest
- Front Bucket Seats
- Electronic Stability Control
- Air Conditioning
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.