2025 BMW M5 Base at Irvine BMW
https://research.irvinebmw.com/cars/New/2025/BMW/M5/Base/159834752025 BMW M5 Base
Call for Pricing
Photo Gallery
Vehicle Basics
Additional Incentives
- Condition : New
- Mileage : 15
- VIN : WBS83FK03SCU88039
- Stock # : C75860
- Engine :
- Transmission : 8-Speed Automatic Sport
- Ext. Color : White
- Int. Color : Black
- Vehicle Type : Sedan
- Body Style : 4D Sedan
- Drivetrain : AWD
City MPG *
0
Hwy MPG *
0
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
Alpine White 2025 BMW M5 AWD 8-Speed Automatic Sport 4.4L V8 Turbocharged DOHC 32V LEV3-SULEV30 Black Leather.
Vehicle Features
- Wheels: 20" x 10.5" Fr & 21" x 11" Rr M Dual-Spoke
- Wheels: 20" x 10.5" Fr & 21" x 11" Rr Jet Black
- M Multi-Function Seats
- Extended Merino Leather Upholstery
- Radio: AM/FM Audio System
- Driving Assistance Professional Package
- Executive Package
- BMW Iconic Glow Kidney Grille
- M Compound Brakes w/Red Calipers
- Carbon Fiber Silver Thread High Gloss Trim
- Power Rear Sunshade & Rear Side Window Shades
- Front Ventilated Seats
- Power Front Seats
- Heated Front Seats
- Front & Rear Heated Seats
- Interior Camera
- Active Driving Assistant Pro
- Parking Assistant Plus
- SiriusXM Satellite Radio w/1-Year Subscription
- BMW Assist eCall
- BMW TeleServices
- ConnectedDrive Services
- Connected Package Pro
- Bowers & Wilkins Surround Sound
- Wireless Device Charging
- Personal eSIM 5G
- BMW Curved Display w/HUD
- Apple CarPlay Compatibility
- 4-Wheel Disc Brakes
- Air Conditioning
- Electronic Stability Control
- Front Bucket Seats
- Front Center Armrest
- Live Cockpit Pro (incl. Navi)
- Tachometer
- ABS brakes
- Adaptive suspension
- Alloy wheels
- Auto tilt-away steering wheel
- Auto-dimming door mirrors
- Automatic temperature control
- Brake assist
- Bumpers: body-color
- Delay-off headlights
- Driver door bin
- Driver vanity mirror
- Dual front impact airbags
- Dual front side impact airbags
- Four wheel independent suspension
- Front anti-roll bar
- Front dual zone A/C
- Front reading lights
- Fully automatic headlights
- Universal garage-door opener
- Heated door mirrors
- Heated front seats
- Heated steering wheel
- Illuminated entry
- Leather steering wheel
- Low tire pressure warning
- Memory seat
- Occupant sensing airbag
- Outside temperature display
- Overhead airbag
- Panic alarm
- Passenger door bin
- Passenger vanity mirror
- Power door mirrors
- Power driver seat
- Power passenger seat
- Power steering
- Power windows
- Radio data system
- Rain sensing wipers
- Rear air conditioning
- Rear anti-roll bar
- Rear dual zone A/C
- Rear reading lights
- Rear seat center armrest
- Rear window defroster
- Comfort Access keyless entry
- Security system
- Speed control
- Speed-sensing steering
- Split folding rear seat
- Sport steering wheel
- Steering wheel memory
- Steering wheel mounted audio controls
- Telescoping steering wheel
- Tilt steering wheel
- Traction control
- Trip computer
- Turn signal indicator mirrors
- Variably intermittent wipers
- Auto-dimming Rear-View mirror
- 18 Speakers
- Heads-Up Display
- Speed-Sensitive Wipers
- AM/FM radio: SiriusXM
- Exterior Parking Camera Rear
- Auto High-beam Headlights
- Emergency communication system: BMW Assist eCall
- Hybrid system combined power torque: 738 lb.-ft.
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.